Summary
High network load can consume CPU power in such a way that the normal operation of the device can be affected; that is, the configured cycle time can be influenced.
Vulnerabilities 1
-
High 7.5
ABB, Phoenix Contact, Schneider Electric, Siemens, WAGO - Programmable Logic Controllers, multiple versions. Researcher…
Revision history
-
#2
ICSA-19-106-03 PLC Cycle Time Influences (Update A)
-
#1
ICSA-19-106-03 PLC Cycle Time Influences
References
-
ICS Advisory ICSA-19-106-03 Web Version
https://www.cisa.gov/news-events/ics-advisories/icsa-19-106-03
-
Recommended Practices
https://www.us-cert.gov/ics/alerts/ICS-ALERT-10-301-01
-
Recommended Practices
https://www.us-cert.gov/sites/default/files/recommended_practices/NCCIC_ICS-CERT_Defense_in_Depth_2016_S508C.pdf
-
Recommended Practices
https://www.us-cert.gov/ics/tips/ICS-TIP-12-146-01B